What is Wi-Fi Optimization?
A stronger wireless foundation for campus
A campus-wide initiative to strengthen wireless coverage and create a more consistent experience for teaching, research, and operations, building a strong, sustainable wireless foundation for the future.
Why it matters
Reliable wireless reduces disruptions to teaching and research, enables a “Wi-Fi first” approach, and supports long-term cost avoidance across campus.
Initiative objectives
Four core objectives
A systematic, campus-wide effort organized around four objectives.
1
Survey coverage
Conduct Wi-Fi coverage surveys across campus buildings to identify coverage deficiencies.
2
Design
Create wireless designs that support optimal coverage and capacity.
3
Implement
Implement recommended designs in all E&G (Education and General) spaces.
4
Plan ahead
Develop recommended designs for auxiliary spaces for future funding consideration.
Key benefits
What changes for campus
Improved reliability
Improved wireless reliability, reducing disruptions to teaching, research, and daily operations.
“Wi-Fi first” approach
Enablement of a “Wi-Fi first” network approach, supporting long-term cost avoidance.
A modern foundation
A modern wireless foundation to support future technologies and evolving security needs.
A multiyear, phased effort
Three phases, highest impact first
The initiative is phased to address the highest-impact spaces first. Scheduling factors in current Wi-Fi coverage, impact to teaching and research, and accessibility of space in light of construction and operational activities.
Phase 1
Highest-impact spaces
Approx. Sept 2026 to Aug 2027
75
buildings
Phase 2
Continued rollout
Approx. Sept 2027 to Aug 2028
53
buildings
Phase 3
Campus completion
Approx. Sept 2028 to Aug 2029
101
buildings
Phase dates are approximate, targeted timeframes and may shift as the rollout proceeds.
Building tracker
229 buildings are scheduled across the three phases. Track each building’s survey, installation, and validation status.
What to expect
Three stages for every building
Each building moves through three stages. Activities are scheduled in advance and communicated to building contacts.
Stage 1
Survey and design
Enterprise Technology staff will be on-site conducting scheduled site surveys.
Stage 2
Installation
Installation crews will be on-site installing cables and wireless access points to ceilings. Activities will be scheduled in advance and may involve brief, localized disruption to wireless networking and installation-related noise. Accessibility to areas will not generally be impacted.
Stage 3
Validation
Enterprise Technology staff will be conducting a combination of site surveys and remote assessment to validate coverage and performance.
A collaborative initiative
Supported by Enterprise Technology and campus teams
Wi-Fi Optimization is a collaborative initiative supported by multiple Enterprise Technology and campus teams, including:
Collaborating teams
- University Operations: Planning, Design and Construction
- Environmental Health and Safety
- Campus technical support contacts and building managers
From the newsroom
In the news
Questions about your building?
Contact the networking team about the Wi-Fi Optimization project, or check your building in the tracker.